It is mentioned in the MBA prospectus and Handbook that a project approval will be communicated within 8 weeks of receiving. However, many querries are seen on students not receiving the approval in time thereby spending one full semestar for the project results. When I contacted IGNOU Project department, the office bearer said that they wait for hundreds of requests to be received (300 as I was told) to take up for approval. Sounds contradictory to IGNOU's own policy. For the benefit of all I am attaching the project guidelines.
There are so many issues as I got to know. some of them are: - It is not clear as to how many words a project synopsis to be submitted - Many are confused about choosing a guide - No response to the mails sent by the students - Delay in receiving the approval or rejection - Post project submission of project no clue on evaluation - If synopsis is sent by post no intimation of PP numberI have included a poll here. Share your experience with the MBA Project. Kindly share your innovative way to deal with this or ways to tackle it for the benefit of all students.
This post has been edited by Carbide: Mar 4 2009, 10:06 AM
|
|
|
|
|
|
|
Mar 4 2009, 01:49 PM
|
|
|
I suggest, we should initiate our activities, at least 10 months in advance. As far as myself and my wife are concerned, we are appearing MS-100 in Jan-June 2009 session. We had first sent the Synopsis in the first week of October 2008; the same got returned back to us seeking clarifications / queries. Immediately the same was sent back to IGNOU on 07-Jan-2009, and approval for both us received on 25-Feb-2009. In all these cases, proper response from IGNOU i.e. within two months received.
Let us not take up the preliminary activities during the semester period, instead, we should plan semester period of six months plus four months ahead, thus ten months earlier, we should commence our activities.
|
|
|
|
|
|
|
Mar 4 2009, 03:04 PM
|
|
|
QUOTE (V JAGANNATHAN @ Mar 4 2009, 01:49 PM)  I suggest, we should initiate our activities, at least 10 months in advance. As far as myself and my wife are concerned, we are appearing MS-100 in Jan-June 2009 session. We had first sent the Synopsis in the first week of October 2008; the same got returned back to us seeking clarifications / queries. Immediately the same was sent back to IGNOU on 07-Jan-2009, and approval for both us received on 25-Feb-2009. In all these cases, proper response from IGNOU i.e. within two months received.
Let us not take up the preliminary activities during the semester period, instead, we should plan semester period of six months plus four months ahead, thus ten months earlier, we should commence our activities. thanks a lot You have a valid point of 10 months. However one can send the project proposal only after registering for the courses. I got it registered for Jan-Jun session only. Can you also share what kind of clarifications were asked..? just to have an idea
This post has been edited by Carbide: Mar 4 2009, 03:08 PM
|
|
|
|
|
|
|
Mar 4 2009, 05:44 PM
|
|
|
The Registration for a session commences eight months in advance. For example, for July-Dec 2009, it starts from 01-Feb-2009 to 31-Mar-2009. That is, for the session in which MS-100 is to be registered, we should be ready with all requirements of DD, application etc. and submit latest by second day of the month in which re-registration starts. Once you submit the same to your Regional Centre, immediately, submit application along with a copy of the RR form to IGNOU, HQ, New Delhi so that the process can go on.
|
|
|
|
|
|
|
Mar 17 2009, 01:51 PM
|
|
|
QUOTE (V JAGANNATHAN @ Mar 4 2009, 05:44 PM)  The Registration for a session commences eight months in advance. For example, for July-Dec 2009, it starts from 01-Feb-2009 to 31-Mar-2009. That is, for the session in which MS-100 is to be registered, we should be ready with all requirements of DD, application etc. and submit latest by second day of the month in which re-registration starts. Once you submit the same to your Regional Centre, immediately, submit application along with a copy of the RR form to IGNOU, HQ, New Delhi so that the process can go on. I wish you good results for the well planned effort....
Can you please share your experience on: - What are the discripancies may lead to return of synopsis for resubmission - What could be the ideal lengh of synopsis - Please share the thoughts which are not given in the prospectus
|
|
|
|
|
|
|
Apr 1 2009, 06:57 PM
|
New Recruitment

Group: New User
Posts: 1
Joined: 1-April 09
Member No.: 2,053
|
Hi Jagannathan , Thanks for posting such a good info . Could you please suggest some project topics in Operations Management for MS 100 project work
Any one who is aware of this can help me in selecting good project .
THanks in Advance and awaiting for the response at the earliest
|
|
|
|
|
|
|
Apr 1 2009, 07:10 PM
|
|
|
QUOTE (Carbide @ Mar 4 2009, 03:04 PM)  QUOTE (V JAGANNATHAN @ Mar 4 2009, 01:49 PM)  I suggest, we should initiate our activities, at least 10 months in advance. As far as myself and my wife are concerned, we are appearing MS-100 in Jan-June 2009 session. We had first sent the Synopsis in the first week of October 2008; the same got returned back to us seeking clarifications / queries. Immediately the same was sent back to IGNOU on 07-Jan-2009, and approval for both us received on 25-Feb-2009. In all these cases, proper response from IGNOU i.e. within two months received.
Let us not take up the preliminary activities during the semester period, instead, we should plan semester period of six months plus four months ahead, thus ten months earlier, we should commence our activities. thanks a lot You have a valid point of 10 months. However one can send the project proposal only after registering for the courses. I got it registered for Jan-Jun session only. Can you also share what kind of clarifications were asked..? just to have an ideaI suggest the moment you submit your RR form to your RC, simultaneously apply for Project Proposal (if you calculate the total time till the period you appear for exam / assignment / duration, you will find the ten months). As regards general queries, following are to be kept in mind in order to avoid queries raised by IGNOU:- 1. Objectives of the Project to be clear. Specify what are your objectives in the Project 2. Number of Samples to be specified clearly. 3. Research Methodology to be specified clearly. 4. Total number of students enrolled with the Guide including yourself to be specified clearly. 5. The Guide should preferably from the same main stream (like Marketing / Operations/ HR etc.) and should guide only for that stream. He can preferably be a visiting Lecturer of IGNOU MBA courses. 6. Usually, the Synopsis should be within 4 to 5 pages.
|
|
|
|
|
|
|
Apr 1 2009, 08:29 PM
|
|
|
QUOTE (V JAGANNATHAN @ Apr 1 2009, 07:10 PM)  I suggest the moment you submit your RR form to your RC, simultaneously apply for Project Proposal (if you calculate the total time till the period you appear for exam / assignment / duration, you will find the ten months). As regards general queries, following are to be kept in mind in order to avoid queries raised by IGNOU:- 1. Objectives of the Project to be clear. Specify what are your objectives in the Project 2. Number of Samples to be specified clearly. 3. Research Methodology to be specified clearly. 4. Total number of students enrolled with the Guide including yourself to be specified clearly. 5. The Guide should preferably from the same main stream (like Marketing / Operations/ HR etc.) and should guide only for that stream. He can preferably be a visiting Lecturer of IGNOU MBA courses. 6. Usually, the Synopsis should be within 4 to 5 pages. thanks a lot ... thats really informative
|
|
|
|
|
|
|
Sep 19 2009, 10:35 PM
|
New Recruitment

Group: New User
Posts: 1
Joined: 19-September 09
Member No.: 5,878
|
Hi I have a doubt about the validity of project payment. I have enrolled to MS-100 for Jan 2008 by paying 2000rs. But is that valid now also? Can I use the same and complete my project OR do I need to pay again?
thanks, acharya
|
|
|
|
|
|
|
Sep 22 2009, 01:46 PM
|
|
|
I am facing problem a problem in making project. I am making it on Impoted coal market. Please send me the soft copy on gkmishra2001@gmail.com . for this i will be very very thankful to you and this forum.
|
|
|
|
|
|
|
Oct 13 2009, 01:33 PM
|
New Recruitment

Group: New User
Posts: 1
Joined: 13-October 09
From: Pune
Member No.: 6,607
|
Dear Mr. Jaganathan
I paid my project fees in year 2008 but could not send my project proposal yet due to non availability of Project Guide. Can you help me to get any projrct guide or suggest if we can choose the project guide from our company / corporates in HR/ Recruitment.
PLease suggest whether i should pay the fee again or its not required.
I want to finish the project ASAP, as almost all the papaers are completed only MS-95 result awaited.
Kindly revert .
Best Regards
Vikas Gupta
|
|
|
|
|
|
|
Oct 13 2009, 06:12 PM
|
|
|
Hi Vikas ji, 1. The Project Guide should preferably be an existing Counsellor at IGNOU Study Centre. 2. What is your specialistion? The Project should be from your specialisation only. 3. Guides other than IGNOU, should have the approval first from IGNOU, which may take at least one year. So dont get into this as you will stand to loose valuable time. 4. When did you register for MS-100 (i.e. the semester session)? The Registration is valid for four semesters only. You can go through the following which will help you in successful accomplition of MS-100. (A file is also attached for your information and reference. )During the last academic semester Jan-June 2009, myself, my wife Nandini, Shri U Krishnamurty, Shri Oommen Varghese have submitted our Projects well within the time. We have pleasure to tell you that we all have done with utmost sincerity in a planned way. With this we have gained good experience and confidence in preparation and submission of projects. Further to the above, I have made a graphical presentation as how to approach and successfully accomplish the project well within the time. Following aspects have been considered for doing the Projct (Split into three Stages):- STAGE 1 - Conceptual - First submit your Re-Registration for Fifth & Final Semester, preferably on the first day (i.e. 01-Aug), so as to save time. (See IGNOU Prospectus - you should have re-registered for MS1 to MS-11; MS-91 & MS-95, for re-registering MS-100)
- Identify your Best Guide (only from specialisation and approved by IGNOU ), preferably from your city/town/Study Centre. (The Guide cannot guide more than five students at a time)
- Identify a topic for MS-100, in consultation with your Guide (being expert, he suggests you a good topic). Prefer a project which could be done on your company. This will facilitate you to gather inputs (primary / secondary)
- Once a topic is finalised, prepare a Synopsis, which will be got signed by your Guide and to be sent to IGNOU for approval.
- Send the Synopsis on or before 10-Aug-2009 (for Jan-June 2010 session)
- Approval of Synopsis takes bare minimum TWO MONTHS.
- After the above, you can concentrate on your balance courses - Assignments/ TEE.
- In case your Synopsis gets returned seeking queries / clarifications, you should re-submit the same (again STAGE 1 process to be followed).. Again from the date of receipt of your revised Synopsis, at IGNOU, two more months time will be required for approval of the Synopsis.
STAGE 2 - Gathering Inputs / Data / Survey - After you receive the approval of Synopsis, you will also get a Project Proposal Number from IGNOU.
- By this time, you would have just completed your Semester exams and be ready to commence the project activities viz. gathering inputs, conduct survey, visit to places (wherever required for Marketing / HR Students).
- Once you complete the above process, you can concentrate on Assignments of Final Semester.
STAGE 3 - Project Submission - Commence your Project compilation Activities preferably on 01-Apr-2010, since, you will require considerable time to devote to the project and simultaneously you have to do assignments and study for TEE as well. That is why take full month to review the project.
- Analysis of Data, Compilation and Presentation of Data in the Project.
- Ensure submission of your Project on or before 30-Apr-2010.
- Go back to studies for Final Semester TEE.
Thus, the total duration of ten months is required for the project so as to complete without any loss of time. Hope this will be useful to you. All the very best. QUOTE (gvacharya @ Sep 19 2009, 10:35 PM)  Hi I have a doubt about the validity of project payment. I have enrolled to MS-100 for Jan 2008 by paying 2000rs. But is that valid now also? Can I use the same and complete my project OR do I need to pay again?
thanks, acharya Dear Acharya, The Registration is valid for FOUR SEMESTERS. In your case, it is Jan-June 2008 July-Dec 2008 Jan-June 2009 July-Dec 2009 So there is absolutely short of time. First submit your synopsis on priority; simultaneously, seek approval from IGNOU that whether your re-registration is valid upon submission of your synopsis for approval. Don't delay. You can also see my detailed reply to Vivek Gupta about MS-100
|
|
|
|
|
|
|
Feb 9 2010, 05:03 AM
|
New Recruitment

Group: New User
Posts: 5
Joined: 6-October 09
Member No.: 6,416
|
This post has been edited by kjosephg: Feb 9 2010, 06:18 AM
|
|
|
|
|
|
|
Feb 19 2011, 01:29 PM
|
New Recruitment

Group: New User
Posts: 2
Joined: 19-February 11
Member No.: 15,375
|
I have submitted my project synopesis twice. Frst one was in the year 2000. For which I followed but i could notb get any claridfication on the same. Then I again submitted the same in 2010. When I enquired from the project division that they have already approved my old synopesis. Now I agin followed up with the school but they have not replied back.
I have completed all my courses except MS 100. The time perios for the completion of MBA is over. Now what all I have to do. I want to complete my project by June 11. As the project is complete and I am waiting for synopesis apporval.
My enrolwment is 940154569. Please guide / help.
Virender
|
|
|
|
|
|
|
Feb 19 2011, 01:38 PM
|
|
|
Hello,
I submitted my MBA Project synopsis in December, but yet I didn`t got any communication from IGNOU,Delhi. Please provide me the Telephone numbers on which I can get help from IGNOU,Delhi. I tried several numbers but they said This is not Project Section call them or given wrong Telephone numbers.
With Thanks Gautam Mishra Gupta Energy Ltd. 9373111494 Nagpur
|
|
|
|
|
|
|
Feb 19 2011, 04:23 PM
|
New Recruitment

Group: New User
Posts: 2
Joined: 19-February 11
Member No.: 15,375
|
Dear Gautam
Actually presently I did'nt recall the no on which I called. But I will check up and come back. If you go through the hand book their are telephoen no of porject / student evaluation no. Just try on that.
On monday I will update the number to.
My telephone no is +919816026465 and email is sharmav1@rediffmail.com
|
|
|
|
|
|
|
Feb 19 2011, 04:38 PM
|
|
|
Dear Virender K,
Thanks for your prompt reply. I will search for number in Handbook and also waiting for the number from your end.
|
|
|
|
|
|
|
Feb 22 2011, 02:38 PM
|
Soldier
 
Group: Members
Posts: 14
Joined: 10-February 10
Member No.: 10,480
|
Hi Gautam, Try this number 011-29534372.This is the number which I called and asked my synopsis staus.They ll ask ur enrol number,title of the project etc and they ll tell u the status of ur synopsis. ALL the BEST! Regards, Charanya
|
|
|
|
|
|
|
Mar 21 2011, 01:35 PM
|
New Recruitment

Group: New User
Posts: 1
Joined: 21-March 11
Member No.: 15,723
|
Hi,
really its a informative web page , Kindly give me the below information,
1. I have registered MS-100 in Jan 2010 and I am about to send the synopsis in April,I wan to know whether the time duration is enough for project submission.
2.Also tell me about the synopsis format .
Thanks
Predhima
|
|
|
|
|
|
|
May 27 2011, 04:19 PM
|
New Recruitment

Group: New User
Posts: 5
Joined: 25-May 11
Member No.: 16,874
|
Hi, Can you provide me the format of synopsis for marketing project. I need it urgently as I need to start my project. Please help me out with the format.
|
|
|
|
|
|
|
Sep 18 2011, 09:32 AM
|
|
|
Hi,
Can you provide me the format of synopsis for finance project. I need it urgently as I need to start my project. Please help me out with the format.
I have search through entire site but found that non have posted a format for synopsis. Kindly help.
|
|
|
|
|
|
|
Sep 20 2011, 09:37 PM
|
Soldier
 
Group: Members
Posts: 11
Joined: 6-September 11
From: Tiruchirappalli, Tamilnadu
Member No.: 19,055
|
Sir I have decided one thing for sure I am quitting this University. for ever..........I am not happy with these things Let them first make their admin things in order Later I will see ................bye to all
|
|
|
|
|
|
|
Oct 21 2011, 07:09 PM
|
Soldier
 
Group: New User
Posts: 8
Joined: 9-August 09
From:
Member No.: 4,984
|
Hi, Can any body tell me what is the procedure and what to do for project? I have enrolled for project for session jan-12toJun-12 and this is my last semester. So pls guide me how can I complete my project in right time and procedure too.. Thanks Santosh Kumar Sah santoshcse23@gmail.com
|
|
|
|
|
|
|
Nov 1 2011, 04:18 PM
|
New Recruitment

Group: New User
Posts: 1
Joined: 1-November 11
Member No.: 19,976
|
Respected Sir, I (Enroll No: 081013523, Ankit V Patel, MP (Specialization in Accounting and Finance)) have submitted the Synopsis copy to ignou on 29 Aug 2011(before 2 month ago). I have got the confirmation of speedpost. But yet I have not received approval status from ignou even after 2 months. I have cleared all other subjects with firstclass and want to complete the project as soon as possible. Because with this degree i will get better job and can help my family. I hope you will co-operate. Thanks, Ankit Cell:08128804948 mail: avpitdotnet@gmail.com
|
|
|
|
|
|
|
Nov 17 2011, 02:52 PM
|
Soldier
 
Group: New User
Posts: 7
Joined: 17-November 11
Member No.: 20,157
|
Dear Jagan sir,
My Name is Shujat Ali B Shaikh (Enrolment No.042474630-MP). I sent my project synopsis on 9th August 2011 by couriers. There is no revert whether Approved / non-approved is received till this date. I phoned ignou, Delhi many times but no one is taking the call. Please provide the status of the case as very little time left for completion of 8 years time available for completion of course.
Sir Please help me.
regards / shujat ali
|
|
|
|
|
|
|
Nov 17 2011, 03:13 PM
|
|
|
Dear Shujat Ali B Shaikh
I would like to share my experience with you.
I also sent my project synopsis in the month of August, 2010 and received the app[roved synopsis on 21st. Novemeber,2010. However, I could submit my project work before due date, i.e. 30th November,2010
So I hope you will get it within a very few days.
Wishing you a good luck
AADRITA
|
|
|
|
|
|
|
Nov 17 2011, 03:19 PM
|
Soldier
 
Group: New User
Posts: 7
Joined: 17-November 11
Member No.: 20,157
|
QUOTE (AADRITA @ Nov 17 2011, 03:13 PM)  Dear Shujat Ali B Shaikh
I would like to share my experience with you.
I also sent my project synopsis in the month of August, 2010 and received the app[roved synopsis on 21st. Novemeber,2010. However, I could submit my project work before due date, i.e. 30th November,2010
So I hope you will get it within a very few days.
Wishing you a good luck
AADRITA Thanks AADRITA for the instant revert but I am little tensed as the time it tickking away. Further one of my friends has also send the synopsis on the same day he has also not received the revert. regards / shujat ali
|
|
|
|
|
|
|
Dec 8 2011, 04:57 PM
|
Soldier
 
Group: New User
Posts: 7
Joined: 17-November 11
Member No.: 20,157
|
I have still received any revert for the Project submitted. Now we in the 1st week of December almost more than 3 months. The patience is getting over. Hardly 7 months left for completion of the tenor of 8 years.
sir, Please help me getting the status of the case.
M/s. 100 - 042474630 - MP
regard / shujat ali
|
|
|
|
|
|
|
Dec 27 2011, 10:07 AM
|
New Recruitment

Group: New User
Posts: 2
Joined: 8-January 11
Member No.: 15,014
|
HI All, I am doing my MBA in operations Have done almost my all the exams and now trying to preapre the project but I stuck in project so need some help for the same. I just need help in synopsis if you guys have anything related to synopsis then please provide me the same, I need a sample of synopsis which can help to prepare the complete synopsis it will be a greate help if u guys can provide me any synopsis so that i can get help how to prepare it. Please send me the copy on amit.15.gupta@gmail.com It will be a great help. Please.. Thanks Amit Gupta
|
|
|
|
|
|
|
Dec 27 2011, 03:29 PM
|
New Recruitment

Group: New User
Posts: 2
Joined: 8-January 11
Member No.: 15,014
|
Hey guys I am trying to submit the project and trying to preparing my synopsis. Can anyone of you send me the sample copy of complete synopsis on amit.15.gupta@gmail.com It will be a great help if u can send this to me.
I will be very thankful to u guys if u can give me ur synopsis for the help.
Thanks AMit
|
|
|
|
|
|