Welcome Guest ( Log In | Register )

          IGNOU Online Forum




3 Pages V   1 2 3 >  
Reply to this topicStart new topic
> Approval Of Project (ms-100) Proposal (with Synopsis), MBA - Project (MS100) approval
Rating 4 V
Satisfaction Survey
You cannot see the results of the poll until you have voted. Please login and cast your vote to see the results of this poll.
Total Votes: 58
Guests cannot vote 
Carbide
post Mar 4 2009, 10:00 AM
Post #1
  


In pursuit of knowledge
*******

Group: Power Users
Posts: 209
Joined: 21-October 08
From: ONLINE
Member No.: 265


 
 
It is mentioned in the MBA prospectus and Handbook that a project approval will be communicated within 8 weeks of receiving. However, many querries are seen on students not receiving the approval in time thereby spending one full semestar for the project results. When I contacted IGNOU Project department, the office bearer said that they wait for hundreds of requests to be received (300 as I was told) to take up for approval. Sounds contradictory to IGNOU's own policy. For the benefit of all I am attaching the project guidelines.

There are so many issues as I got to know. some of them are:
- It is not clear as to how many words a project synopsis to be submitted
- Many are confused about choosing a guide
- No response to the mails sent by the students
- Delay in receiving the approval or rejection
- Post project submission of project no clue on evaluation
- If synopsis is sent by post no intimation of PP number


I have included a poll here. Share your experience with the MBA Project. Kindly share your innovative way to deal with this or ways to tackle it for the benefit of all students.


This post has been edited by Carbide: Mar 4 2009, 10:06 AM
Attached File(s)
Attached File  Project_Guidelines.pdf ( 220.72K ) Number of downloads: 16277
 


 
Go to the top of the page
 
+Quote Post
 
V JAGANNATHAN
post Mar 4 2009, 01:49 PM
Post #2
  


Staff Sergeant
******

Group: Power Users
Posts: 130
Joined: 19-August 08
From: TUTICORIN, TAMIL NADU
Member No.: 88


 
 
I suggest, we should initiate our activities, at least 10 months in advance. As far as myself and my wife are concerned, we are appearing MS-100 in Jan-June 2009 session. We had first sent the Synopsis in the first week of October 2008; the same got returned back to us seeking clarifications / queries. Immediately the same was sent back to IGNOU on 07-Jan-2009, and approval for both us received on 25-Feb-2009. In all these cases, proper response from IGNOU i.e. within two months received.

Let us not take up the preliminary activities during the semester period, instead, we should plan semester period of six months plus four months ahead, thus ten months earlier, we should commence our activities.


 
Go to the top of the page
 
+Quote Post
 
Carbide
post Mar 4 2009, 03:04 PM
Post #3
  


In pursuit of knowledge
*******

Group: Power Users
Posts: 209
Joined: 21-October 08
From: ONLINE
Member No.: 265


 
 
QUOTE (V JAGANNATHAN @ Mar 4 2009, 01:49 PM) *
I suggest, we should initiate our activities, at least 10 months in advance. As far as myself and my wife are concerned, we are appearing MS-100 in Jan-June 2009 session. We had first sent the Synopsis in the first week of October 2008; the same got returned back to us seeking clarifications / queries. Immediately the same was sent back to IGNOU on 07-Jan-2009, and approval for both us received on 25-Feb-2009. In all these cases, proper response from IGNOU i.e. within two months received.

Let us not take up the preliminary activities during the semester period, instead, we should plan semester period of six months plus four months ahead, thus ten months earlier, we should commence our activities.


thanks a lot
You have a valid point of 10 months. However one can send the project proposal only after registering for the courses. I got it registered for Jan-Jun session only. Can you also share what kind of clarifications were asked..? just to have an idea


This post has been edited by Carbide: Mar 4 2009, 03:08 PM


 
Go to the top of the page
 
+Quote Post
 
V JAGANNATHAN
post Mar 4 2009, 05:44 PM
Post #4
  


Staff Sergeant
******

Group: Power Users
Posts: 130
Joined: 19-August 08
From: TUTICORIN, TAMIL NADU
Member No.: 88


 
 
The Registration for a session commences eight months in advance. For example, for July-Dec 2009, it starts from 01-Feb-2009 to 31-Mar-2009. That is, for the session in which MS-100 is to be registered, we should be ready with all requirements of DD, application etc. and submit latest by second day of the month in which re-registration starts. Once you submit the same to your Regional Centre, immediately, submit application along with a copy of the RR form to IGNOU, HQ, New Delhi so that the process can go on.


 
Go to the top of the page
 
+Quote Post
 
Carbide
post Mar 17 2009, 01:51 PM
Post #5
  


In pursuit of knowledge
*******

Group: Power Users
Posts: 209
Joined: 21-October 08
From: ONLINE
Member No.: 265


 
 
QUOTE (V JAGANNATHAN @ Mar 4 2009, 05:44 PM) *
The Registration for a session commences eight months in advance. For example, for July-Dec 2009, it starts from 01-Feb-2009 to 31-Mar-2009. That is, for the session in which MS-100 is to be registered, we should be ready with all requirements of DD, application etc. and submit latest by second day of the month in which re-registration starts. Once you submit the same to your Regional Centre, immediately, submit application along with a copy of the RR form to IGNOU, HQ, New Delhi so that the process can go on.


I wish you good results for the well planned effort....

Can you please share your experience on:
- What are the discripancies may lead to return of synopsis for resubmission
- What could be the ideal lengh of synopsis
- Please share the thoughts which are not given in the prospectus


 
Go to the top of the page
 
+Quote Post
 
RajuManju
post Apr 1 2009, 06:57 PM
Post #6
  


New Recruitment
*

Group: New User
Posts: 1
Joined: 1-April 09
Member No.: 2,053


 
 
Hi Jagannathan , Thanks for posting such a good info . Could you please suggest some project topics in Operations Management for MS 100 project work

Any one who is aware of this can help me in selecting good project .

THanks in Advance and awaiting for the response at the earliest


 
Go to the top of the page
 
+Quote Post
 
V JAGANNATHAN
post Apr 1 2009, 07:10 PM
Post #7
  


Staff Sergeant
******

Group: Power Users
Posts: 130
Joined: 19-August 08
From: TUTICORIN, TAMIL NADU
Member No.: 88


 
 
QUOTE (Carbide @ Mar 4 2009, 03:04 PM) *
QUOTE (V JAGANNATHAN @ Mar 4 2009, 01:49 PM) *
I suggest, we should initiate our activities, at least 10 months in advance. As far as myself and my wife are concerned, we are appearing MS-100 in Jan-June 2009 session. We had first sent the Synopsis in the first week of October 2008; the same got returned back to us seeking clarifications / queries. Immediately the same was sent back to IGNOU on 07-Jan-2009, and approval for both us received on 25-Feb-2009. In all these cases, proper response from IGNOU i.e. within two months received.

Let us not take up the preliminary activities during the semester period, instead, we should plan semester period of six months plus four months ahead, thus ten months earlier, we should commence our activities.


thanks a lot
You have a valid point of 10 months. However one can send the project proposal only after registering for the courses. I got it registered for Jan-Jun session only. Can you also share what kind of clarifications were asked..? just to have an idea



I suggest the moment you submit your RR form to your RC, simultaneously apply for Project Proposal (if you calculate the total time till the period you appear for exam / assignment / duration, you will find the ten months).

As regards general queries, following are to be kept in mind in order to avoid queries raised by IGNOU:-

1. Objectives of the Project to be clear. Specify what are your objectives in the Project
2. Number of Samples to be specified clearly.
3. Research Methodology to be specified clearly.
4. Total number of students enrolled with the Guide including yourself to be specified clearly.
5. The Guide should preferably from the same main stream (like Marketing / Operations/ HR etc.) and should guide only for that stream. He can preferably be a visiting Lecturer of IGNOU MBA courses.
6. Usually, the Synopsis should be within 4 to 5 pages.


 
Go to the top of the page
 
+Quote Post
 
Carbide
post Apr 1 2009, 08:29 PM
Post #8
  


In pursuit of knowledge
*******

Group: Power Users
Posts: 209
Joined: 21-October 08
From: ONLINE
Member No.: 265


 
 
QUOTE (V JAGANNATHAN @ Apr 1 2009, 07:10 PM) *
I suggest the moment you submit your RR form to your RC, simultaneously apply for Project Proposal (if you calculate the total time till the period you appear for exam / assignment / duration, you will find the ten months).
As regards general queries, following are to be kept in mind in order to avoid queries raised by IGNOU:-
1. Objectives of the Project to be clear. Specify what are your objectives in the Project
2. Number of Samples to be specified clearly.
3. Research Methodology to be specified clearly.
4. Total number of students enrolled with the Guide including yourself to be specified clearly.
5. The Guide should preferably from the same main stream (like Marketing / Operations/ HR etc.) and should guide only for that stream. He can preferably be a visiting Lecturer of IGNOU MBA courses.
6. Usually, the Synopsis should be within 4 to 5 pages.


thanks a lot ... thats really informative


 
Go to the top of the page
 
+Quote Post
 
gvacharya
post Sep 19 2009, 10:35 PM
Post #9
  


New Recruitment
*

Group: New User
Posts: 1
Joined: 19-September 09
Member No.: 5,878


 
 
Hi
I have a doubt about the validity of project payment.
I have enrolled to MS-100 for Jan 2008 by paying 2000rs.
But is that valid now also? Can I use the same and complete my project OR do I need to pay again?

thanks,
acharya


 
Go to the top of the page
 
+Quote Post
 
Gautam Kumar Mis...
post Sep 22 2009, 01:46 PM
Post #10
  


Lance Corporal
***

Group: Members
Posts: 28
Joined: 17-January 09
From: Nagpur
Member No.: 926


 
 
I am facing problem a problem in making project.
I am making it on Impoted coal market.

Please send me the soft copy on gkmishra2001@gmail.com .

for this i will be very very thankful to you and this forum.


 
Go to the top of the page
 
+Quote Post
 
Vikas Gupta
post Oct 13 2009, 01:33 PM
Post #11
  


New Recruitment
*

Group: New User
Posts: 1
Joined: 13-October 09
From: Pune
Member No.: 6,607


 
 
Dear Mr. Jaganathan

I paid my project fees in year 2008 but could not send my project proposal yet due to non availability of Project Guide. Can you help me to get any projrct guide or suggest if we can choose the project guide from our company / corporates in HR/ Recruitment.

PLease suggest whether i should pay the fee again or its not required.

I want to finish the project ASAP, as almost all the papaers are completed only MS-95 result awaited.

Kindly revert .

Best Regards

Vikas Gupta


 
Go to the top of the page
 
+Quote Post
 
V JAGANNATHAN
post Oct 13 2009, 06:12 PM
Post #12
  


Staff Sergeant
******

Group: Power Users
Posts: 130
Joined: 19-August 08
From: TUTICORIN, TAMIL NADU
Member No.: 88


 
 
Hi Vikas ji,

1. The Project Guide should preferably be an existing Counsellor at IGNOU Study Centre.
2. What is your specialistion? The Project should be from your specialisation only.
3. Guides other than IGNOU, should have the approval first from IGNOU, which may take at least one year. So dont get into this as you will stand to loose valuable time.
4. When did you register for MS-100 (i.e. the semester session)? The Registration is valid for four semesters only.


You can go through the following which will help you in successful accomplition of MS-100. (A file is also attached for your information and reference. )

During the last academic semester Jan-June 2009, myself, my wife Nandini, Shri U Krishnamurty, Shri Oommen Varghese have submitted our Projects well within the time. We have pleasure to tell you that we all have done with utmost sincerity in a planned way. With this we have gained good experience and confidence in preparation and submission of projects. Further to the above, I have made a graphical presentation as how to approach and successfully accomplish the project well within the time. Following aspects have been considered for doing the Projct (Split into three Stages):- STAGE 1 - Conceptual
  • First submit your Re-Registration for Fifth & Final Semester, preferably on the first day (i.e. 01-Aug), so as to save time. (See IGNOU Prospectus - you should have re-registered for MS1 to MS-11; MS-91 & MS-95, for re-registering MS-100)
  • Identify your Best Guide (only from specialisation and approved by IGNOU ), preferably from your city/town/Study Centre. (The Guide cannot guide more than five students at a time)
  • Identify a topic for MS-100, in consultation with your Guide (being expert, he suggests you a good topic). Prefer a project which could be done on your company. This will facilitate you to gather inputs (primary / secondary)
  • Once a topic is finalised, prepare a Synopsis, which will be got signed by your Guide and to be sent to IGNOU for approval.
  • Send the Synopsis on or before 10-Aug-2009 (for Jan-June 2010 session)
  • Approval of Synopsis takes bare minimum TWO MONTHS.
  • After the above, you can concentrate on your balance courses - Assignments/ TEE.
  • In case your Synopsis gets returned seeking queries / clarifications, you should re-submit the same (again STAGE 1 process to be followed).. Again from the date of receipt of your revised Synopsis, at IGNOU, two more months time will be required for approval of the Synopsis.
STAGE 2 - Gathering Inputs / Data / Survey
  • After you receive the approval of Synopsis, you will also get a Project Proposal Number from IGNOU.
  • By this time, you would have just completed your Semester exams and be ready to commence the project activities viz. gathering inputs, conduct survey, visit to places (wherever required for Marketing / HR Students).
  • Once you complete the above process, you can concentrate on Assignments of Final Semester.
STAGE 3 - Project Submission
  • Commence your Project compilation Activities preferably on 01-Apr-2010, since, you will require considerable time to devote to the project and simultaneously you have to do assignments and study for TEE as well. That is why take full month to review the project.
  • Analysis of Data, Compilation and Presentation of Data in the Project.
  • Ensure submission of your Project on or before 30-Apr-2010.
  • Go back to studies for Final Semester TEE.
Thus, the total duration of ten months is required for the project so as to complete without any loss of time. Hope this will be useful to you. All the very best.

QUOTE (gvacharya @ Sep 19 2009, 10:35 PM) *
Hi
I have a doubt about the validity of project payment.
I have enrolled to MS-100 for Jan 2008 by paying 2000rs.
But is that valid now also? Can I use the same and complete my project OR do I need to pay again?

thanks,
acharya


Dear Acharya,

The Registration is valid for FOUR SEMESTERS. In your case, it is
Jan-June 2008
July-Dec 2008
Jan-June 2009
July-Dec 2009

So there is absolutely short of time. First submit your synopsis on priority; simultaneously, seek approval from IGNOU that whether your re-registration is valid upon submission of your synopsis for approval. Don't delay. You can also see my detailed reply to Vivek Gupta about MS-100
Attached File(s)
Attached File  PLAN_MS_100.pdf ( 45.77K ) Number of downloads: 3809
 


 
Go to the top of the page
 
+Quote Post
 
kjosephg
post Feb 9 2010, 05:03 AM
Post #13
  


New Recruitment
*

Group: New User
Posts: 5
Joined: 6-October 09
Member No.: 6,416


 
 




This post has been edited by kjosephg: Feb 9 2010, 06:18 AM


 
Go to the top of the page
 
+Quote Post
 
Virender K
post Feb 19 2011, 01:29 PM
Post #14
  


New Recruitment
*

Group: New User
Posts: 2
Joined: 19-February 11
Member No.: 15,375


 
 
I have submitted my project synopesis twice. Frst one was in the year 2000. For which I followed but i could notb get any claridfication on the same. Then I again submitted the same in 2010. When I enquired from the project division that they have already approved my old synopesis. Now I agin followed up with the school but they have not replied back.

I have completed all my courses except MS 100. The time perios for the completion of MBA is over. Now what all I have to do. I want to complete my project by June 11. As the project is complete and I am waiting for synopesis apporval.

My enrolwment is 940154569.
Please guide / help.

Virender


 
Go to the top of the page
 
+Quote Post
 
Gautam Kumar Mis...
post Feb 19 2011, 01:38 PM
Post #15
  


Lance Corporal
***

Group: Members
Posts: 28
Joined: 17-January 09
From: Nagpur
Member No.: 926


 
 
Hello,

I submitted my MBA Project synopsis in December, but yet I didn`t got any communication from IGNOU,Delhi. Please provide me the Telephone numbers on which I can get help from IGNOU,Delhi. I tried several numbers but they said This is not Project Section call them or given wrong Telephone numbers.


With Thanks
Gautam Mishra
Gupta Energy Ltd.
9373111494
Nagpur


 
Go to the top of the page
 
+Quote Post
 
Virender K
post Feb 19 2011, 04:23 PM
Post #16
  


New Recruitment
*

Group: New User
Posts: 2
Joined: 19-February 11
Member No.: 15,375


 
 
Dear Gautam

Actually presently I did'nt recall the no on which I called. But I will check up and come back. If you go through the hand book their are telephoen no of porject / student evaluation no. Just try on that.

On monday I will update the number to.

My telephone no is +919816026465
and email is sharmav1@rediffmail.com


 
Go to the top of the page
 
+Quote Post
 
Gautam Kumar Mis...
post Feb 19 2011, 04:38 PM
Post #17
  


Lance Corporal
***

Group: Members
Posts: 28
Joined: 17-January 09
From: Nagpur
Member No.: 926


 
 
Dear Virender K,

Thanks for your prompt reply. I will search for number in Handbook and also waiting for the number from your end.


 
Go to the top of the page
 
+Quote Post
 
Charanya
post Feb 22 2011, 02:38 PM
Post #18
  


Soldier
**

Group: Members
Posts: 14
Joined: 10-February 10
Member No.: 10,480


 
 
Hi Gautam,

Try this number 011-29534372.This is the number which I called and asked my synopsis staus.They ll ask ur enrol number,title of the project etc and they ll tell u the status of ur synopsis.

ALL the BEST! mellow.gif

Regards,

Charanya


 
Go to the top of the page
 
+Quote Post
 
Predhima
post Mar 21 2011, 01:35 PM
Post #19
  


New Recruitment
*

Group: New User
Posts: 1
Joined: 21-March 11
Member No.: 15,723


 
 
Hi,

really its a informative web page , Kindly give me the below information,

1. I have registered MS-100 in Jan 2010 and I am about to send the synopsis in April,I wan to know whether the time duration is enough for project submission.

2.Also tell me about the synopsis format .

Thanks

Predhima


 
Go to the top of the page
 
+Quote Post
 
bhautik
post May 27 2011, 04:19 PM
Post #20
  


New Recruitment
*

Group: New User
Posts: 5
Joined: 25-May 11
Member No.: 16,874


 
 
Hi,
Can you provide me the format of synopsis for marketing project. I need it urgently as I need to start my project. Please help me out with the format.


 
Go to the top of the page
 
+Quote Post
 
yagya shree
post Sep 18 2011, 09:32 AM
Post #21
  


Lance Corporal
***

Group: Members
Posts: 20
Joined: 31-August 10
From: mumbai
Member No.: 13,450


 
 
Hi,

Can you provide me the format of synopsis for finance project. I need it urgently as I need to start my project. Please help me out with the format.

I have search through entire site but found that non have posted a format for synopsis. Kindly help.


 
Go to the top of the page
 
+Quote Post
 
swami_bank
post Sep 20 2011, 09:37 PM
Post #22
  


Soldier
**

Group: Members
Posts: 11
Joined: 6-September 11
From: Tiruchirappalli, Tamilnadu

Member No.: 19,055


 
 
Sir
I have decided one thing for sure
I am quitting this University.
for ever..........I am not happy with these things
Let them first make their admin things in order
Later I will see ................bye to all


 
Go to the top of the page
 
+Quote Post
 
Santosh Kumar Sa...
post Oct 21 2011, 07:09 PM
Post #23
  


Soldier
**

Group: New User
Posts: 8
Joined: 9-August 09
From:
Member No.: 4,984


 
 
Hi,
Can any body tell me what is the procedure and what to do for project? I have enrolled for project for session jan-12toJun-12 and this is my last semester. So pls guide me how can I complete my project in right time and procedure too..


Thanks

Santosh Kumar Sah
santoshcse23@gmail.com


 
Go to the top of the page
 
+Quote Post
 
avpitdotnet
post Nov 1 2011, 04:18 PM
Post #24
  


New Recruitment
*

Group: New User
Posts: 1
Joined: 1-November 11
Member No.: 19,976


 
 
Respected Sir,

I (Enroll No: 081013523, Ankit V Patel, MP (Specialization in Accounting and Finance)) have submitted the Synopsis copy to ignou on 29 Aug 2011(before 2 month ago). I have got the confirmation of speedpost. But yet I have not received approval status from ignou even after 2 months. I have cleared all other subjects with firstclass and want to complete the project as soon as possible. Because with this degree i will get better job and can help my family. I hope you will co-operate.

Thanks, Ankit Cell:08128804948 mail: avpitdotnet@gmail.com


 
Go to the top of the page
 
+Quote Post
 
Shujat Ali
post Nov 17 2011, 02:52 PM
Post #25
  


Soldier
**

Group: New User
Posts: 7
Joined: 17-November 11
Member No.: 20,157


 
 
Dear Jagan sir,

My Name is Shujat Ali B Shaikh (Enrolment No.042474630-MP). I sent my project synopsis on 9th August 2011 by couriers. There is no revert whether Approved / non-approved is received till this date. I phoned ignou, Delhi many times but no one is taking the call. Please provide the status of the case as very little time left for completion of 8 years time available for completion of course.

Sir Please help me.



regards / shujat ali


 
Go to the top of the page
 
+Quote Post
 
AADRITA
post Nov 17 2011, 03:13 PM
Post #26
  


Lance Corporal
***

Group: Members
Posts: 27
Joined: 28-October 10
From: KOLKATA
Member No.: 14,240


 
 
Dear Shujat Ali B Shaikh

I would like to share my experience with you.

I also sent my project synopsis in the month of August, 2010 and received the app[roved synopsis on 21st. Novemeber,2010. However, I could submit my project work before due date, i.e. 30th November,2010

So I hope you will get it within a very few days.

Wishing you a good luck

AADRITA


 
Go to the top of the page
 
+Quote Post
 
Shujat Ali
post Nov 17 2011, 03:19 PM
Post #27
  


Soldier
**

Group: New User
Posts: 7
Joined: 17-November 11
Member No.: 20,157


 
 
QUOTE (AADRITA @ Nov 17 2011, 03:13 PM) *
Dear Shujat Ali B Shaikh

I would like to share my experience with you.

I also sent my project synopsis in the month of August, 2010 and received the app[roved synopsis on 21st. Novemeber,2010. However, I could submit my project work before due date, i.e. 30th November,2010

So I hope you will get it within a very few days.

Wishing you a good luck

AADRITA


Thanks AADRITA for the instant revert but I am little tensed as the time it tickking away. Further one of my friends has also send the synopsis on the same day he has also not received the revert.



regards / shujat ali


 
Go to the top of the page
 
+Quote Post
 
Shujat Ali
post Dec 8 2011, 04:57 PM
Post #28
  


Soldier
**

Group: New User
Posts: 7
Joined: 17-November 11
Member No.: 20,157


 
 
I have still received any revert for the Project submitted. Now we in the 1st week of December almost more than 3 months. The patience is getting over. Hardly 7 months left for completion of the tenor of 8 years.

sir, Please help me getting the status of the case.

M/s. 100 - 042474630 - MP

regard / shujat ali


 
Go to the top of the page
 
+Quote Post
 
MBAinOperation
post Dec 27 2011, 10:07 AM
Post #29
  


New Recruitment
*

Group: New User
Posts: 2
Joined: 8-January 11
Member No.: 15,014


 
 
HI All,

I am doing my MBA in operations Have done almost my all the exams and now trying to preapre the project but I stuck in project so need some help for the same. I just need help in synopsis if you guys have anything related to synopsis then please provide me the same,

I need a sample of synopsis which can help to prepare the complete synopsis it will be a greate help if u guys can provide me any synopsis so that i can get help how to prepare it.

Please send me the copy on amit.15.gupta@gmail.com It will be a great help.

Please..

Thanks
Amit Gupta angry.gif


 
Go to the top of the page
 
+Quote Post
 
MBAinOperation
post Dec 27 2011, 03:29 PM
Post #30
  


New Recruitment
*

Group: New User
Posts: 2
Joined: 8-January 11
Member No.: 15,014


 
 
Hey guys I am trying to submit the project and trying to preparing my synopsis. Can anyone of you send me the sample copy of complete synopsis on amit.15.gupta@gmail.com It will be a great help if u can send this to me.

I will be very thankful to u guys if u can give me ur synopsis for the help.

Thanks
AMit


 
Go to the top of the page
 
+Quote Post
 

3 Pages V   1 2 3 >
Reply to this topicStart new topic

 

IPB RSS Lo-Fi Version Time is now: 24th May 2013 - 11:31 PM IPB